Environmental aspect assessments for every department, in one place

Each department analyses its processes, lists inputs and outputs, scores significance, and sends it to the HSE manager for review and the IMSR for approval. The register of significant aspects builds itself.

Included in Integrated IMS and Enterprise or add the Safety & Environment Pack

Environmental Aspects

Before and after Quality One

  1. 01

    One Excel file per department, with formulas that drift

    One form in the system; ΣL × ΣC and the significance level are calculated as you type

  2. 02

    You can’t tell which departments have finished

    The dashboard shows every department’s assessment status for the year

  3. 03

    Compiling the organisation’s significant aspects takes ages

    A register of significant aspects from every approved department, filterable by type and department

Steps

How it works

  1. 1

    Analyse the process

    Work from each process to its inputs (resources used), outputs (waste and pollution) and environmental impacts.

  2. 2

    Score significance

    Score likelihood (L) and consequence (C), direct or indirect, under normal, abnormal and emergency conditions, and flag legal requirements.

  3. 3

    Review and approve

    The preparer sends it to the HSE manager for review, then the IMSR approves or returns it with a reason.

  4. 4

    Follow up high aspects

    High-significance aspects show on the dashboard with a follow-up deadline, so none slip through.

Capabilities

Everything this process needs

Pollution and resource use

Air, water, noise and waste, plus electricity, water, fuel and raw materials, in one form.

Heat map and dashboard

L × C heat map, significance by type and department, and the top-scoring aspects.

Your own criteria

Reword criteria and move the significance bands to match your procedure.

Excel import and export

Bring existing assessment workbooks in, and export the register any time.

Suggestion library

Pick processes, inputs and outputs other departments already used instead of retyping them.

Print the assessment

Save assessments and the register as PDF for audits.

Environmental Aspects
Environmental Aspects

Questions about this module

Yes. Clause 6.1.2 asks you to identify environmental aspects and determine the significant ones; the assessments and register serve as that evidence.

Yes. The wording of the L and C factors and the score bands for each level are adjustable in Master Data.

Integrated IMS and Enterprise, or add the Safety & Environment Pack (฿2,990 a month for the whole organisation), which includes HIRA.

Contact

Ready for your team to try it

Leave a few details and we’ll get back to you to arrange a walkthrough, or chat with us on LINE.

Try it free for 7 days

Pick one module. Sample data is ready for you, start right away. No card needed.