Project audits with a checklist that’s ready to use

Checklists for project documents and site surveillance, with criteria on every item. Pick a result per item, attach photos and raise an NCR on the spot, alongside a full-year audit plan and project quality register.

Included in Enterprise or add the Projects Pack

Project Quality

Before and after Quality One

  1. 01

    Every auditor uses a different Excel checklist and different criteria

    One standard checklist, with criteria that say exactly what passes

  2. 02

    Working out which items apply to each project takes time

    The checklist keeps only the activities that project is required to have

  3. 03

    You can’t tell what’s done, shifted or overdue

    A full-year weekly Gantt, coloured by status in every cell

Steps

How it works

  1. 1

    Register the project

    Name, code, project manager, value and complexity, which set how often it is audited and which items apply.

  2. 2

    Plan audits

    Set each project’s audit weeks on the full-year Gantt.

  3. 3

    Audit with the checklist

    Choose Project Audit or Site Surveillance, read the criteria and pick Pass, NC, OFI, N/A or WIP per item. Attach site photos.

  4. 4

    Raise NCRs and follow up

    Raise an NCR straight from the audit report. Project NCRs gather on the project page until closed.

Capabilities

Everything this process needs

Two checklists

Project Audit covers 31 project document items grouped by phase. Site Surveillance covers PPE, measuring tools, materials and workmanship.

Clear criteria on every item

Each item says what document or site condition passes, so every auditor judges the same way.

One tap per item

Pass, NC, OFI, N/A, or WIP for work still under way, with a field for the evidence seen.

Only the items that apply

The checklist is trimmed to the activities each project needs for its complexity level.

Adjustable criteria

Reword criteria to match your own standards in Master Data.

NCRs from failed items

Findings link to an NCR right away, and every project NCR is in one place.

Weekly Gantt audit plan

The whole year on one page, coloured done, shifted or overdue.

Project dashboard

Audits, scores and status across all projects.

Print audit reports

Save the report with its checklist, results and site photos as PDF.

Project Quality

Questions about this module

Project-based organisations such as construction, systems installation, engineering or multi-site services.

No. A ready-made checklist runs from contract and TOR through planning, design and testing to handover items such as As-Built, O&M and Punch List. Every item has criteria you can reword.

From the project’s value and complexity; the criteria are adjustable in Master Data.

Enterprise, or add the Projects Pack (฿1,990 a month for the whole organisation) to any other plan.

Contact

Ready for your team to try it

Leave a few details and we’ll get back to you to arrange a walkthrough, or chat with us on LINE.

Try it free for 7 days

Pick one module. Sample data is ready for you, start right away. No card needed.